This trail bridge was built without decking to cut down on the overall weight.
|

|
The trail bridge had to be hand carried down a trail to its present location on the Red Brook. |

|
Once in place, volunteers carried in pre-cut lumber and added the decking. |

|
Aluminum trail bridge after installation |

|
Detail of aluminum trail bridge |
 |