This 59' aluminum gangway is set in place from the pier at the Dundalk Marine Terminal, Baltimore Maryland, to a dolphin where cargo ships dock for unloading.
The view from the dolphin to the pier, this industrial application required a walking surface made with I-bar grating.
This 60' aluminum gangway goes from shore to a dolphin at Cianbro Constructors, Eastern Manufacturing Facilities, Brewer, Maine.
A second 74' aluminum gangway runs from dolphin to dolphin. This facility also loads cargo.